29-N general election in Jaén How to vote, the calendar and every result since 1977

The A-401 between Úbeda and Jódar reopens on Wednesday, the 18th after the bridge works

The bridge over the Guadalquivir returns to traffic a month earlier than planned after three and a half months of closure at kilometre 12.

JaénYa newsroom ·

Siete personas sentadas alrededor de una mesa de madera en una sala con paredes de madera, con documentos y una botella de agua.
Photo: Prensa Jaén DGOB

The A-401 road between Jódar and Úbeda reopens to traffic on Wednesday, November 18. That day the bridge over the Guadalquivir river enters service, closed since last August 3 due to reconstruction works. The reopening comes a month earlier than planned, according to the Regional Ministry of Development and Mobility.

The closure has forced drivers in the Sierra Mágina area to use alternative routes for three and a half months. General traffic has circulated along the A-320 and A-6104 roads, while agricultural vehicles and light traffic have used the Puente Viejo and the Camino Viejo de Granada. To facilitate circulation, the surface of the A-6104 was reinforced, signage was improved and metal safety barriers were installed, and work was carried out on the pavement, ditches and protection systems on several sections of the Camino Viejo de Granada.

A new 103-metre deck

The works have consisted of the complete replacement of the bridge deck, 103 metres long, and the rehabilitation of its piers and abutments. The new structure has 20 beams of more than 20 metres and a slab of about 950 square metres. The pavement, expansion joints, drainage, signage and safety elements have also been renewed, including 206 metres of metal parapets.

The work began after a technical inspection detected cracks in the beams of the old deck that compromised the safety of the structure, as well as corrosion in the reinforcement and carbonation of the concrete. That is why it was decided to demolish the deck and build a new one with prefabricated prestressed concrete beams.

The reconstruction has cost 2.75 million euros, charged to the Plan Andalucía Actúa, and is part of the emergency works to repair the damage from the 2026 storms on the regional road network in southern Jaén. The bridge was damaged by the series of storms in January and February.

The Regional Minister of Development and Mobility, Mario Muñoz-Atanet, has thanked «the understanding and patience of the drivers and users who have used alternative routes during these months». Muñoz-Atanet met with the mayor of Jódar, Juana Cazorla, to report on the latest steps of the intervention. Also present were the territorial delegate of Development and Mobility, Miguel Contreras, and the head of the Jaén Roads Service, Marta Gámez.

Share this story

Shall we let you know what matters?

Phone alerts

Change or remove it in my alerts

1 foto

Foto: Prensa Jaén DGOB

What it's about

Economy and employment